Motorists are advised of changed traffic conditions from this weekend while work is carried out on the Nowra bridge project.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Work will be carried out from November 1 for one month, on sections of the Princes Highway, Scenic Drive and Bolong, Illaroo and Bridge roads.
To minimise impacts to motorists, and for the safety of workers, some of this work will be carried out at night between 6pm and 7am, weather permitting.
Read more:
Planned traffic changes will include lane closures, intermittent stop/slow traffic conditions, and reduced speeds of 40 km/h will be in place during this work for the safety of workers and motorists.
Electronic signs will be in place before and during these changes to advertise specific locations and dates in advance.
Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.
Transport for NSW thanks the community for its patience while work is carried out.