RAIL AND ROAD UPDATE

TRAINS have resumed operation between Port Kembla and Wollongong on the South Coast Line after an earlier suspension due to flooding.

However some trains on the South Coast Line continue to be delayed up to 30 minutes due to earlier track equipment repairs at Bombo. Buses may supplement some trains until services return to timetable. The following roads are currently affected by flooding: Fern Street is closed in Gerringong between the Princes Highway and Belinda Street. Northbound traffic using the Princes Highway between BTU Road and Central Avenue should exercise caution due to water across the road. Motorists are advised to allow extra travel time and drive to the conditions. For the latest public transport information visit

www.131500.com.au

or call 131 500. For the latest traffic information visit

www.livetraffic.com

or call 132 701.

www.131500.com.au

www.livetraffic.com

www.131500.com.au

www.livetraffic.com

Smartphone
Tablet - Narrow
Tablet - Wide
Desktop